Updates
View All- 30.09.2024 -
- 27.09.2024 -
Advisory regarding sharing of dedicated Connectivity Infrastructure
- 05.09.2024 -
- 31.08.2024 -
- 12.07.2024 -
- 03.07.2024 -
- 21.06.2024 -
- 03.05.2024 -
- 31.03.2024 -
- 21.03.2024 -
Advisory regarding sharing of dedicated Connectivity Infrastructure
Ministry of Power, GOI vide Gazette Notification dated 09.03.2021 has notified Central Transmission Utility of India Limited (CTUIL), a Government Company as Central Transmission Utility. Accordingly, CTUIL has started functioning w.e.f 01.04.2021 as wholly owned subsidiary of POWERGRID to undertake and discharge all functions of CTU under the Electricity Act, 2003 and functions assigned under regulations/directions by Central Commission/Authority and also any other directions/functions assigned by the Central Government. CTU has been assigned the responsibility of undertaking transmission of electricity through inter-state transmission system and discharge...
CTU has been assigned the responsibility of undertaking...
Communication System has a vital role for safe...
CTU is the nodal agency for grant of...
CERC notified the Central Electricity Regulatory Commission (Sharing...
Engineering Department provides Estimated Cost of the Transmission...
CTU is the Nodal Agency for administration of...
PM GatiShakti National Master Plan was launched on...
Upcoming Inter-State Transmission System (ISTS) and associated Generation...
“Bid Process Coordinator (BPC) of the TBCB project...
Schemes
CKM
MVA
Schemes
CKM
MVA
Schemes
CKM
MVA
CTUIL as an organization strives to enforce an ecosystem which will boost the renewable energy sector. CTU is dedicated towards facilitating integration of renewable energy sources with the grid in line with vision of Hon’ble Prime minister for achieving targets of renewable energy integration and reduction of carbon footprint. CTU facilitates ease of access of information to generation developers through single window portals line NSWS besides readily available information pertaining to upcoming transmission system for facilitation of RE injection, bay availability and margin.
Transmission system planned in consultation with stakeholders facilitating evacuation of power from 172.5 GW of RE generating capacity (including large hydro), which is about 41% of the total installed electricity generating capacity in the country.
As a significant step towards successfully achieving the planned RE capacity by 2030, transmission system has been planned for about 537 GW of RE capacity.
Helpdesks created from time to time for helping developers understand new regulations, procedure and portals.
The length of the transmission lines and sub-station capacity planned under ISTS for integration of additional wind and solar capacity by 2030 has been estimated as 50,890 ckm and 4,33,575 MVA respectively at an estimated cost of Rs 2,44,200 crores.
....
....
....
....
....
....
....
Appointment of Independent Engineer for “Transmission System for evacuation of power from Rajasthan REZ Ph-IV...
Appointment of Independent Engineer for “Transmission System for evacuation of power from Rajasthan REZ Ph-IV...
Appointment of Independent Engineer for “Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV...
Appointment of Independent Engineer for “Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV...
Appointment of Independent Engineer for “Transmission System for evacuation of power from Rajasthan REZ Ph-IV...
Appointment of Independent Engineer for “North-Eastern Region Generation Scheme-I (NERGS-I)”.Spec. No. CTUIL/IE/2024-25/41...
Procurement & Installation of 05 nos of 1.5 Ton, 5 Star, Inverter Split Air Conditioners...
Procurement of 32 nos. of Storwel Plain and 10 nos. of Fire-Resistant filling Cabinet (FRFC)...
Deployment of Security Personnel at CTUIL New Office – IRCON International Tower-1, Sector-32, Gurugram through...
Appointment of Independent Engineer for “Transmission System for evacuation of power from potential Renewable Energy...