Sr.No. |
Date |
Title |
File |
1 |
31/08/2023 |
Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-08-2023  |
|
2 |
31/08/2023 |
Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-08-2023  |
|
3 |
31/08/2023 |
List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-08-2023  |
|
4 |
31/07/2023 |
Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-07-2023 |
|
5 |
31/07/2023 |
Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-07-2023 |
|
6 |
31/07/2023 |
List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-07-2023 |
|
7 |
30/06/2023 |
Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 30-06-2023 |
|
8 |
30/06/2023 |
Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 30-06-2023 |
|
9 |
30/06/2023 |
List of Connectivity Margin in ISTS Substations available by Mar-27 as on 30-06-2023 |
|
10 |
31/05/2023 |
Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-05-2023 |
|
11 |
31/05/2023 |
List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-05-2023 |
|
12 |
31/05/2023 |
Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-05-2023 |
|
13 |
15/05/2023 |
Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 15-05-2023 |
|
14 |
15/05/2023 |
List of Connectivity Margin in ISTS Pooling Stations available by Mar-27 as on 15-05-2023 |
|
15 |
15/05/2023 |
Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 15-05-2023 |
|
16 |
30/04/2023 |
Status of margins available at existing ISTS substations for proposed RE integration as on 30-04-2023 |
|
17 |
31/03/2023 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.03.2023 |
|
18 |
28/02/2023 |
Status of margins available at existing ISTS substations for proposed RE integration as on 28.02.2023 |
|
19 |
31/01/2023 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.01.2023 |
|
20 |
31/12/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.12.2022 |
|
21 |
30/11/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 30.11.2022 |
|
22 |
31/10/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.10.2022 |
|
23 |
30/09/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 30.09.2022 |
|
24 |
31/08/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.08.2022 |
|
25 |
31/08/2022 |
Status of margins available at existing ISTS substations for proposed RE integration as on 31.07.2022 (with Bikaner-II PS updated as on 31.08.2022) |
|