Sr.No. Date Title File
1 31/08/2023 Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-08-2023
2 31/08/2023 Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-08-2023
3 31/08/2023 List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-08-2023
4 31/07/2023 Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-07-2023
5 31/07/2023 Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-07-2023
6 31/07/2023 List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-07-2023
7 30/06/2023 Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 30-06-2023
8 30/06/2023 Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 30-06-2023
9 30/06/2023 List of Connectivity Margin in ISTS Substations available by Mar-27 as on 30-06-2023
10 31/05/2023 Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 31-05-2023
11 31/05/2023 List of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-05-2023
12 31/05/2023 Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 31-05-2023
13 15/05/2023 Status of margins available at existing ISTS substations (non RE) for proposed RE integration as on 15-05-2023
14 15/05/2023 List of Connectivity Margin in ISTS Pooling Stations available by Mar-27 as on 15-05-2023
15 15/05/2023 Summary of Connectivity Margin in ISTS Substations available by Mar-27 as on 15-05-2023
16 30/04/2023 Status of margins available at existing ISTS substations for proposed RE integration as on 30-04-2023
17 31/03/2023 Status of margins available at existing ISTS substations for proposed RE integration as on 31.03.2023
18 28/02/2023 Status of margins available at existing ISTS substations for proposed RE integration as on 28.02.2023
19 31/01/2023 Status of margins available at existing ISTS substations for proposed RE integration as on 31.01.2023
20 31/12/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 31.12.2022
21 30/11/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 30.11.2022
22 31/10/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 31.10.2022
23 30/09/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 30.09.2022
24 31/08/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 31.08.2022
25 31/08/2022 Status of margins available at existing ISTS substations for proposed RE integration as on 31.07.2022 (with Bikaner-II PS updated as on 31.08.2022)
Sr.No. Date Title File
1 31/08/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31-08-2023
2 31/07/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31-07-2023
3 30/06/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 30-06-2023
4 31/05/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31-05-2023
5 30/04/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 30-04-2023
6 31/03/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.03.2023(revised)
7 31/03/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.03.2023
8 28/02/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 28.02.2023
9 31/01/2023 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.01.2023
10 31/12/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.12.2022
11 30/11/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 30.11.2022
12 31/10/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.10.2022
13 30/09/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 30.09.2022
14 31/08/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.08.2022
15 31/07/2022 Status of allocation of bays at ISTS substations for Stage-II Connectivity grantees as on 31.07.2022 (with Bikaner-II PS updated as on 31.08.2022)